Day 16 Construction

Day 16 Construction

Rooms are starting to take shape. Air conditioning ducts are being hung. There is a hole in the roof for the HVAC system. And, they’re starting on the back wall cut for the roll-up door.

Ducts being installed for Air Conditioning

Hole through the ceiling for the HVAC system

The private room is starting to take shape

Preparing to cut through the back wall for the roll-up door

#dreamingdog

Stay In The Loop